Water Infrastructure & Main Transmission Line Project
Albnayat Al-Arabia Co. executed the main water transmission pipeline project in Mina, Makkah Al-Mukarramah. The scope involved bulk water supply infrastructure, high-capacity transmission mains, and specialized civil works tailored for heavy-demand seasonal utility operations.
- Main Water Transmission Mains
- High-Capacity Pipeline Laying
- Trench Excavation & Site Works
- Valve Chambers & Infrastructure
- Hydrostatic Pressure Testing
- NWC Standards Compliance
Post-Construction Evaluation
Albnayat Al-Arabia Co. ensures continuous supply reliability and zero-leak integrity across high-demand water transmission networks. Our engineering teams utilize specialized equipment to deliver robust infrastructure compliant with National Water Company (NWC) specifications.