Proof, project by project.

A portfolio of water and wastewater infrastructure delivered across the Kingdom — reservoirs, transmission mains, pump stations and treated-effluent systems.

0 +
Projects delivered
0 km
Pipeline & network installed
0 M m³
Reservoir capacity built
0 bn
SAR contracted value
Water Transmission Line — Tarj Dam to Al-Namas (Stage 1)
+
Water · NWC
Water Transmission Line — Tarj Dam to Al-Namas (Stage 1)

Asir · 30 months. Transmission line from the Tarj Dam purification plant to Al-Namas Governorate with strategic tanks — first stage.

Potable Water Network with Reservoir — Makkah
+
Water · MEWA
Potable Water Network with Reservoir — Makkah

Makkah Region · 32 months. Potable-water network with an elevated reservoir serving communities across the Makkah region.

Sewage & Stormwater Network with Lifting Station
+
Sewage · NWC
Sewage & Stormwater Network with Lifting Station

Jazan · 36 months. Northern-network sewage and stormwater drainage with a lifting station to protect the city from flooding.

Pumping Stations & Strategic Tanks — Transmission Line 2-3
+
Pump Stations · NWC
Pumping Stations & Strategic Tanks — Transmission Line 2-3

Al-Qassim · 30 months. Pumping stations and strategic reservoirs established on the 2-3 transmission line.

Water Transmission Line — Tarj Dam to Al-Namas (Phase II)
+
Water · NWC
Water Transmission Line — Tarj Dam to Al-Namas (Phase II)

Asir · 24 months. Continuation of the Tarj Dam–Al-Namas transmission line with strategic reservoirs — phase II.

Village Water Project — Comprehensive, Stage 2-1
+
Water · NWC
Village Water Project — Comprehensive, Stage 2-1

Hail · 30 months. Comprehensive village water supply, stage 2-1, from the main line to Saaf, Arbwan and Al-Aradia.

Tank & Distribution Station — Tabalah & Al-Thaniyah, Bisha
+
Reservoir · MEWA
Tank & Distribution Station — Tabalah & Al-Thaniyah, Bisha

Bisha (Asir) · 24 months. Tank and distribution station between the Tabalah and Al-Thaniyah centres.

Water Tank & Distribution Station — Khyber Al-Janoub
+
Reservoir · MEWA
Water Tank & Distribution Station — Khyber Al-Janoub

Asir · 18 months. Water tank and distribution station in Khyber Al-Janoub, Khamis Mushait.

Tank & Distribution Station — Al-Hazmi, Bisha
+
Reservoir · MEWA
Tank & Distribution Station — Al-Hazmi, Bisha

Bisha (Asir) · 24 months. Construction of a tank and distribution station at the Al-Hazmi Centre.

Collection Tank & Distribution Station — Foamah
+
Reservoir · Asir
Collection Tank & Distribution Station — Foamah

Asir · 18 months. Collection tank and distribution station serving Foamah Centre, Khamis Mushait.

Sewage Networks — South of Jisr Al-Siteen
+
Sewage · NWC
Sewage Networks — South of Jisr Al-Siteen

Asir · 30 months. Sewage networks for the neighbourhoods south of Jisr Al-Siteen, Khamis Mushait.